Lay Decking Over Concrete: If you know how, you can put super decking over concrete. If you have old concrete that has to be replaced, decking is an excellent method to hide it. The decking will not only hide the concrete flaws, but it will also convert your outside space into a gorgeous landscape. The advantage of decking installation is that it eliminates the need to tear down concrete before placing decking on it. On concrete, Komposittråll is simple to install. Here are some ideas about how to lay decking on concrete.
Decking installation over concrete
If you want to put decking over concrete by yourself, you’ll need to gather your materials and tools. Choose whether you want to put wood or composite decking over concrete. Treated wood, screws, a handsaw, and a power drill are all required. Once your kompositbrädor is ready, simply follow the instructions outlined below.
Step 1: Clear the area
To begin, prepare the area where the decking will be installed. Check the concrete for any areas where water can collect. If a segment has to be repaired, do so before laying the decking board on the concrete. This will prevent water from soaking into the decking sleepers.
Step 2: Place the decking sleepers
Although certain composite decking types do not require sleepers for installation on concrete, if you are using composite decking that does not require sleepers, you may skip this step. Begin installing the sleepers by outlining the area where they will be placed.
Sleepers are the foundations on which the composite decking will be installed. You may put your composite decking on concrete using wooden sleepers. Wood beds can also be replaced with aluminum sleepers. They cannot absorb water or deteriorate in the same way that wood does.
You may install the sleeper when you’ve completed designating the area where you want it to go. To keep the sleepers in place, screw them to the concrete. When placing your sleepers, keep in mind that they should be spaced at least one foot apart.
Small spacers between the sleeper and the concrete are also required. Water will not come into touch with the sleepers because of the spacer. You may also put some underneath the sleepers to help with drainage. Additionally, joist tape can be applied to the tops of the sleepers to prevent them from absorbing water. You may begin placing the sleepers as soon as you finish installing them on the concrete.
Step 3: Install the decking on the concrete
Composite decking is simple to install. Begin putting the decking on the side of your house and work your way out. It is critical to remember that while putting the decking boards, you should allow a 5 mm gap between them. Between the decking and the wall, there is roughly 15 mm of gap.
When the temperature changes, the space between the decks allows the board to expand and compress without causing harm. Aside from that, it makes it easy for water to drain off the decking. Screws or concealed fasteners can be used to secure the decking to the joist. If you’re utilizing Capped Komposittråll, you may attach the decking to the joists with concealed screws. The concealed fasteners give the piece a neat appearance.
Step 4: Complete the ends
When you’ve done placing the composite decking over concrete, you may now finish the decking ends. Use the picture framing approach or add fascia boards to the decking edges to achieve this. You may also opt to paint the decking ends to match the rest of the deck. Your decking is now installed, and you can begin utilizing it right now.
Conclusion
If you have an old concrete slab in your home, you may build decking over it. Before placing the decking board on the concrete, start by building a sleeper system.